Gridline

Data and method

Gridline reads GB's public grid connection registers, keeps every release, and links each project across them under one ID. Every figure here is built from those files.

Registers held

Not held yet: National Grid Electricity Distribution (NGED), covering the Midlands, South Wales and the South West. Totals for those areas are partial.

How the queue is counted once

  1. Added up. Every row's MW that has an agreement but isn't connected yet.
  2. Stages. The TEC Register repeats a staged project's earlier stages (Hornsea 3: 2,250 MW, then 3,000 MW in total), so each project counts once, at its last stage.
  3. Two lists. A project on a regional register that is linked to a national project keeps only the national figure. The range runs from certain links only to possible matches too.

The Local networks / National grid switch splits the queue in two: the national grid (a TEC project connected straight to transmission) and local networks (everything on a regional network, including TEC's embedded projects). Areas are compared on the same level.

Credits